United States 2026 · Every advertiser
Weld Re-8 School District
This page ran 16 paid political ads on Facebook and Instagram between 4 May 2026 and 20 May 2026. Meta reports $3.7–5.7K of spend, which makes it the 6,761st largest advertiser of the 24,034 pages in our data. Advertiser type: Public body. Most of its spend took no side. Race: Ballot measures.
Data from the Meta Ad Library, pulled 4 November 2026. Election on 3 November 2026. · Every ad of this page in Meta’s Ad Library ↗
16
ads
$4.7K
reported spend, range $3.7–5.7K
0.0%
of spend on federal races
$50
median spend per ad
Spend by week the ad started
Tone
Share of the 16 ads with text that our model classified. Attack ads name an opponent.
Topics
Spend by race: Ballot measures 100%.
Spend by ad language: English 89%, Spanish 11%.
The costliest ads
The highest-spend ad of each distinct text, as it ran.
Weld Re-8 is considering two possible funding proposals for the November 2026 ballot to address operating and facility needs: a mill levy override to increase teacher and staff salaries, and a downsized bond proposal to address districtwide facility improvements, including a new secure entry and additional career and technical space at the high school. Nothing is set in stone. Before any final decisions are made, the District is committed to gathering additional public input.
20 May 2026 · Weld Re-8 School District · $1.5–2K · 350K+ impressions · Informational · Ad Library
Weld Re-8 is considering two possible funding proposals for the November 2026 ballot to address operating and facility needs: a mill levy override to increase teacher and staff salaries, and a downsized bond proposal to address districtwide facility improvements, including a new secure entry and additional career and technical space at the high school. Nothing is set in stone. Before any final decisions are made, the District is committed to gathering additional public input. Learn more: weld8
8 May 2026 · Weld Re-8 School District · $800 – $899 · 90K+ impressions · Informational · Ad Library
Weld Re-8 está evaluando dos posibles propuestas de financiamiento para la boleta electoral de noviembre de 2026, con el fin de atender las necesidades operativas y de infraestructura: un aumento en la tasa impositiva (mill levy override) para incrementar los salarios de los maestros y del personal, y una propuesta de bonos de menor envergadura destinada a realizar mejoras en las instalaciones de todo el distrito, lo que incluye una nueva entrada segura y espacios adicionales para la educación t
20 May 2026 · Weld Re-8 School District · $400 – $499 · 80K+ impressions · Informational · Ad LibrarySpanish
Figures cover domestic political ads paid in dollars, from 4 May 2026. Spend is the sum of Meta’s range midpoints; impressions above one million are reported as “1M+”, so impression figures are floors. Each ad counts in the week its delivery started, with its lifetime spend at our last pull; ads still running before the vote are counted as of 31 October 2026.
Back to the United States report, both parties and every candidate or every advertiser.