United States 2026 · Every advertiser

Virginians For a Smarter Digital Future

This page ran 23 paid political ads on Facebook and Instagram between 5 June 2026 and 28 September 2026. Meta reports $52.4–65.3K of spend, which makes it the 1,128th largest advertiser of the 24,034 pages in our data. Advertiser type: Group or campaign. Most of its spend took no side. Race: No specific race. Paid for by Virginians for a Smarter Digital Future.

Data from the Meta Ad Library, pulled 4 November 2026. Election on 3 November 2026. · Every ad of this page in Meta’s Ad Library ↗

23

ads

$58.8K

reported spend, range $52.4–65.3K

0.0%

of spend on federal races

$1.2K

median spend per ad

Spend by week the ad started

1 Jun
6 Jul
3 Aug
7 Sep
5 Oct
 Spend still counting
2 Nov

Tone

Attack
100%

Share of the 23 ads with text that our model classified. Attack ads name an opponent.

Most attacked

  • The Governor$3.4K
  • The General Assembly and Governor Spanberger$2.5K

Targets as the ads name them, by spend; the spellings of Donald Trump are counted together, other names as written.

Topics

Infrastructure & energy
100%
Economy & cost of living
43%
Corruption & governance
35%

Spend by race: No specific race 100%.

Spend by ad language: English 100%.

The costliest ads

The highest-spend ad of each distinct text, as it ran.

  • Data centers need over $12B in new infrastructure. Should that land on your bill? Tell the SCC no.

    2 July 2026 · Virginians For a Smarter Digital Future · $15–20K · 1M+ impressions · Attack · Ad Library

  • Power line plans for data centers threaten private property rights, individual landowners, and our most historic sites.

    5 June 2026 · Virginians For a Smarter Digital Future · $7–8K · 500K+ impressions · Attack · Ad Library

  • Beyond tax revenue, data centers are costing Virginians their quality of life. Who is protecting our community?

    15 June 2026 · Virginians For a Smarter Digital Future · $4–4.5K · 400K+ impressions · Attack · Ad Library

  • Miles of new transmission lines are cutting through Virginia communities to power data centers - and you're paying.

    1 July 2026 · Virginians For a Smarter Digital Future · $3.5–4K · 350K+ impressions · Attack · Ad Library

  • New transmission towers for data centers are reducing property values and scarring VA communities, and you are paying for it.

    8 July 2026 · Virginians For a Smarter Digital Future · $3–3.5K · 300K+ impressions · Attack · Ad Library

  • There’s more than 280M sq ft of data centers in VA’s pipeline. The Governor’s plan doesn’t address it. We need a pause so we can plan.

    28 September 2026 · Virginians For a Smarter Digital Future · $2.5–3K · 700K+ impressions · Attack · Ad Library

Figures cover domestic political ads paid in dollars, from 4 May 2026. Spend is the sum of Meta’s range midpoints; impressions above one million are reported as “1M+”, so impression figures are floors. Each ad counts in the week its delivery started, with its lifetime spend at our last pull; ads still running before the vote are counted as of 31 October 2026.

Back to the United States report, both parties and every candidate or every advertiser.

Virginians For a Smarter Digital Future: political ads on Facebook and Instagram before the 2026 US midterms · Vipima