United States 2026 · Every advertiser
Virginians For a Smarter Digital Future
This page ran 23 paid political ads on Facebook and Instagram between 5 June 2026 and 28 September 2026. Meta reports $52.4–65.3K of spend, which makes it the 1,128th largest advertiser of the 24,034 pages in our data. Advertiser type: Group or campaign. Most of its spend took no side. Race: No specific race. Paid for by Virginians for a Smarter Digital Future.
Data from the Meta Ad Library, pulled 4 November 2026. Election on 3 November 2026. · Every ad of this page in Meta’s Ad Library ↗
23
ads
$58.8K
reported spend, range $52.4–65.3K
0.0%
of spend on federal races
$1.2K
median spend per ad
Spend by week the ad started
Tone
Share of the 23 ads with text that our model classified. Attack ads name an opponent.
Most attacked
- The Governor$3.4K
- The General Assembly and Governor Spanberger$2.5K
Targets as the ads name them, by spend; the spellings of Donald Trump are counted together, other names as written.
Topics
Spend by race: No specific race 100%.
Spend by ad language: English 100%.
The costliest ads
The highest-spend ad of each distinct text, as it ran.
Data centers need over $12B in new infrastructure. Should that land on your bill? Tell the SCC no.
2 July 2026 · Virginians For a Smarter Digital Future · $15–20K · 1M+ impressions · Attack · Ad Library
Power line plans for data centers threaten private property rights, individual landowners, and our most historic sites.
5 June 2026 · Virginians For a Smarter Digital Future · $7–8K · 500K+ impressions · Attack · Ad Library
Beyond tax revenue, data centers are costing Virginians their quality of life. Who is protecting our community?
15 June 2026 · Virginians For a Smarter Digital Future · $4–4.5K · 400K+ impressions · Attack · Ad Library
Miles of new transmission lines are cutting through Virginia communities to power data centers - and you're paying.
1 July 2026 · Virginians For a Smarter Digital Future · $3.5–4K · 350K+ impressions · Attack · Ad Library
New transmission towers for data centers are reducing property values and scarring VA communities, and you are paying for it.
8 July 2026 · Virginians For a Smarter Digital Future · $3–3.5K · 300K+ impressions · Attack · Ad Library
There’s more than 280M sq ft of data centers in VA’s pipeline. The Governor’s plan doesn’t address it. We need a pause so we can plan.
28 September 2026 · Virginians For a Smarter Digital Future · $2.5–3K · 700K+ impressions · Attack · Ad Library
Figures cover domestic political ads paid in dollars, from 4 May 2026. Spend is the sum of Meta’s range midpoints; impressions above one million are reported as “1M+”, so impression figures are floors. Each ad counts in the week its delivery started, with its lifetime spend at our last pull; ads still running before the vote are counted as of 31 October 2026.
Back to the United States report, both parties and every candidate or every advertiser.