United States 2026 · Every advertiser
Texans for Economic Liberty
This page ran 53 paid political ads on Facebook and Instagram between 9 September 2026 and 23 October 2026. Meta reports $1.3–1.5M of spend, which makes it the 44th largest advertiser of the 24,034 pages in our data. Advertiser type: Group or campaign. Most of its spend took no side. Race: No specific race.
Data from the Meta Ad Library, pulled 4 November 2026. Election on 3 November 2026. · Every ad of this page in Meta’s Ad Library ↗
53
ads
$1.4M
reported spend, range $1.3–1.5M
0.0%
of spend on federal races
$6.5K
median spend per ad
Spend by week the ad started
Tone
Share of the 53 ads with text that our model classified. Attack ads name an opponent.
Topics
Spend by race: No specific race 100%.
Spend by ad language: English 100%.
The costliest ads
The highest-spend ad of each distinct text, as it ran.
Data centers are building Texas jobs for electricians, welders and pipefitters. Stand with the trades. Add your name.
9 September 2026 · Texans for Economic Liberty · $175–200K · 1M+ impressions · Promotional · Ad Library
Every groundbreaking means good-paying work for Texas trades. That's the Texas Standard at work. Stand with the workers building Texas.
10 September 2026 · Texans for Economic Liberty · $150–175K · 1M+ impressions · Promotional · Ad Library
Do you trust China with your data? Texas data centers keep American data in American hands. Tell us where you stand.
9 September 2026 · Texans for Economic Liberty · $125–150K · 1M+ impressions · Promotional · Ad Library
Should your data stay in America? Texas data centers keep it out of the hands of hostile foreign nations like China. Add your name.
9 September 2026 · Texans for Economic Liberty · $125–150K · 900K+ impressions · Informational · Ad Library
Every data center built in Texas is built by Texans. That's Texas leadership. Stand with the skilled trades powering our state.
9 September 2026 · Texans for Economic Liberty · $100–125K · 1M+ impressions · Promotional · Ad Library
The Texas Standard puts Texans first. Data centers provide their own power, reuse their own water, lower electricity costs and protect communities. Add your name
9 September 2026 · Texans for Economic Liberty · $100–125K · 900K+ impressions · Promotional · Ad Library
Figures cover domestic political ads paid in dollars, from 4 May 2026. Spend is the sum of Meta’s range midpoints; impressions above one million are reported as “1M+”, so impression figures are floors. Each ad counts in the week its delivery started, with its lifetime spend at our last pull; ads still running before the vote are counted as of 31 October 2026.
Back to the United States report, both parties and every candidate or every advertiser.