United States 2026 · Every advertiser
Renew Illinois Power
This page ran 47 paid political ads on Facebook and Instagram between 4 May 2026 and 29 May 2026. Meta reports $5.6–10.3K of spend, which makes it the 4,920th largest advertiser of the 24,034 pages in our data. Advertiser type: Group or campaign. Most of its spend took no side. Race: No specific race.
Data from the Meta Ad Library, pulled 4 November 2026. Election on 3 November 2026. · Every ad of this page in Meta’s Ad Library ↗
47
ads
$7.9K
reported spend, range $5.6–10.3K
0.0%
of spend on federal races
$50
median spend per ad
Spend by week the ad started
Tone
Share of the 47 ads with text that our model classified. Attack ads name an opponent.
Topics
Spend by race: No specific race 100%.
Spend by ad language: English 100%.
The costliest ads
The highest-spend ad of each distinct text, as it ran.
The Baldwin Power Plant is proposing to use part of its property for a development to help strengthen the grid and generate additional electricity locally. Learn how this plan moves the plant forward and tell IL EPA you support putting this site back to work.
27 May 2026 · Renew Illinois Power · $600 – $699 · 20K+ impressions · Promotional · Ad Library
The Edwards Power Plant is proposing to use part of its property for a development to help strengthen the grid and generate additional electricity locally. Learn how this plan moves the plant forward and tell IL EPA you support putting this site back to work.
27 May 2026 · Renew Illinois Power · $500 – $599 · 15K+ impressions · Promotional · Ad Library
The Hennepin Power Plant is proposing to use part of its property for a development to help strengthen the grid and generate additional electricity locally. Learn how this plan moves the plant forward and tell IL EPA you support putting this site back to work.
27 May 2026 · Renew Illinois Power · $500 – $599 · 15K+ impressions · Promotional · Ad Library
The Kincaid Power Plant is proposing to use part of its property for a development to help strengthen the grid and generate additional electricity locally. Learn how this plan moves the plant forward and tell IL EPA you support putting this site back to work.
27 May 2026 · Renew Illinois Power · $300 – $399 · 10K+ impressions · Promotional · Ad Library
The EEI/Joppa Power Plant is proposing to use part of its property for a development to help strengthen the grid and generate additional electricity locally. Learn how this plan moves the plant forward and tell IL EPA you support putting this site back to work.
27 May 2026 · Renew Illinois Power · $200 – $299 · 5K+ impressions · Promotional · Ad Library
The Newton Power Plant is proposing to use part of its property for a development to help strengthen the grid and generate additional electricity locally. Learn how this plan moves the plant forward and tell IL EPA you support putting this site back to work.
4 May 2026 · Renew Illinois Power · $200 – $299 · 10K+ impressions · Promotional · Ad Library
Figures cover domestic political ads paid in dollars, from 4 May 2026. Spend is the sum of Meta’s range midpoints; impressions above one million are reported as “1M+”, so impression figures are floors. Each ad counts in the week its delivery started, with its lifetime spend at our last pull; ads still running before the vote are counted as of 31 October 2026.
Back to the United States report, both parties and every candidate or every advertiser.