Proposed Logan Prairie Data Center

This page ran 6 paid political ads on Facebook and Instagram between 8 May 2026 and 18 May 2026. Meta reports $1.3–1.9K of spend, which makes it the 11,386th largest advertiser of the 24,034 pages in our data. Advertiser type: Unidentified. Most of its spend took no side. Race: No specific race. Paid for by Hut 8.

Data from the Meta Ad Library, pulled 4 November 2026. Election on 3 November 2026. · Every ad of this page in Meta’s Ad Library ↗

6

ads

$1.6K

reported spend, range $1.3–1.9K

0.0%

of spend on federal races

$100

median spend per ad

Spend by week the ad started

4 May
1 Jun
6 Jul
3 Aug
7 Sep
5 Oct
 Spend still counting
2 Nov

Tone

Promotional
83%
Informational
17%

Share of the 6 ads with text that our model classified. Attack ads name an opponent.

Topics

Infrastructure & energy
100%
Economy & cost of living
33%
Jobs & youth
17%

Spend by race: No specific race 100%.

Spend by ad language: English 100%.

The costliest ads

The highest-spend ad of each distinct text, as it ran.

  • Here's exactly what Hut 8 has committed to Logan County — in a signed, public letter to the County Board: ✅ $65M contributed to the county annually ✅ Minimum of 100+ new, full-time jobs with local hiring priority ✅ Water usage capped at 9,000 gallons per day ✅ Full compliance with Illinois environmental regulations ✅ A responsible decommissioning plan These are our commitments to provide meaningful, responsible, and lasting economic benefits. Read the full letter.

    18 May 2026 · Proposed Logan Prairie Data Center · $700 – $799 · 35K+ impressions · Promotional · Ad Library

  • The Latham Fire District is getting $1M+ per year in new revenue. That's what the Logan Prairie Data Center means for Logan County.

    8 May 2026 · Proposed Logan Prairie Data Center · $500 – $599 · 45K+ impressions · Promotional · Ad Library

  • Long-term benefits, long-term accountability — a proposed data center built right for Logan County.

    8 May 2026 · Proposed Logan Prairie Data Center · $100 – $199 · 9K+ impressions · Promotional · Ad Library

  • See what Hut 8 is willing to put in writing for a 500 MW data center in Logan County.

    8 May 2026 · Proposed Logan Prairie Data Center · $0 – $99 · 1K+ impressions · Promotional · Ad Library

  • 9,000 gallons per day. That's the water cap for the Logan Prairie Data Center. Learn the facts about this proposed project in Logan County.

    8 May 2026 · Proposed Logan Prairie Data Center · $0 – $99 · 2K+ impressions · Informational · Ad Library

Figures cover domestic political ads paid in dollars, from 4 May 2026. Spend is the sum of Meta’s range midpoints; impressions above one million are reported as “1M+”, so impression figures are floors. Each ad counts in the week its delivery started, with its lifetime spend at our last pull; ads still running before the vote are counted as of 31 October 2026.

Back to the United States report, both parties and every candidate or every advertiser.

Proposed Logan Prairie Data Center: political ads on Facebook and Instagram before the 2026 US midterms · Vipima