United States 2026 · Every advertiser
Powering an Affordable and Clean Colorado
This page ran 71 paid political ads on Facebook and Instagram between 23 September 2026 and 13 October 2026. Meta reports $10.6–19.6K of spend, which makes it the 3,226th largest advertiser of the 24,034 pages in our data. Advertiser type: Group or campaign. Most of its spend took no side. Race: No specific race.
Data from the Meta Ad Library, pulled 4 November 2026. Election on 3 November 2026. · Every ad of this page in Meta’s Ad Library ↗
71
ads
$15.1K
reported spend, range $10.6–19.6K
0.0%
of spend on federal races
$50
median spend per ad
Spend by week the ad started
Tone
Share of the 71 ads with text that our model classified. Attack ads name an opponent.
Most attacked
- Xcel and Big Tech$13.1K
- Xcel Energy$1.6K
- Xcel$448
Targets as the ads name them, by spend; the spellings of Donald Trump are counted together, other names as written.
Topics
Spend by race: No specific race 100%.
Spend by ad language: English 100%.
The costliest ads
The highest-spend ad of each distinct text, as it ran.
Sign our petition to tell the PUC to put people over profits by ensuring Xcel and Big Tech don’t raise our energy bills, pollute our air, and sign secret fast-tracked contracts in the name of cashing in on this AI data center boom.
10 October 2026 · Powering an Affordable and Clean Colorado · $1–1.5K · 30K+ impressions · Attack · Ad Library
Xcel Energy is asking the Public Utilities Commission to approve its ability to strike secret, fast-track deals with Big Tech so they can bring more AI data centers to Colorado. Our energy bills and progress toward clean air would be at the mercy of these secret deals. Not the future you want? Sign our petition today!
10 October 2026 · Powering an Affordable and Clean Colorado · $100 – $199 · 5K+ impressions · Attack · Ad Library
Right now, Xcel is asking the PUC to approve their plan for providing electricity to AI data centers coming to Colorado. That plan includes the potential for higher household energy bills, fast-tracked secret contracts with out-of-state tech companies, and more pollution. Without statewide guardrails on large-scale data centers, they are already poised to spike our energy bills, guzzle up our drinking water, and increase air and noise pollution. How Xcel chooses to power these data centers can
6 October 2026 · Powering an Affordable and Clean Colorado · $100 – $199 · 3K+ impressions · Attack · Ad Library
Figures cover domestic political ads paid in dollars, from 4 May 2026. Spend is the sum of Meta’s range midpoints; impressions above one million are reported as “1M+”, so impression figures are floors. Each ad counts in the week its delivery started, with its lifetime spend at our last pull; ads still running before the vote are counted as of 31 October 2026.
Back to the United States report, both parties and every candidate or every advertiser.