United States 2026 · Every advertiser
Investing in Grayslake
This page ran 15 paid political ads on Facebook and Instagram between 16 September 2026 and 1 October 2026. Meta reports $15.1–20.2K of spend, which makes it the 2,862nd largest advertiser of the 24,034 pages in our data. Advertiser type: Unidentified. Most of its spend took no side. Race: No specific race. Paid for by T5@Chicago IV, LP.
Data from the Meta Ad Library, pulled 4 November 2026. Election on 3 November 2026. · Every ad of this page in Meta’s Ad Library ↗
15
ads
$17.6K
reported spend, range $15.1–20.2K
0.0%
of spend on federal races
$1.7K
median spend per ad
Spend by week the ad started
Tone
Share of the 15 ads with text that our model classified. Attack ads name an opponent.
Topics
Spend by race: No specific race 100%.
Spend by ad language: English 100%.
The costliest ads
The highest-spend ad of each distinct text, as it ran.
“Will the new data center be loud?” Sound levels from the data center will be at or below the applicable state standards. Project plans include acoustic enclosures, acoustic deadening mufflers, and sound absorptive screening designed by independent engineers.
1 October 2026 · Investing in Grayslake · $1.5–2K · 400K+ impressions · Promotional · Ad Library
How much revenue will the new data center generate in property taxes? An estimated $1.4 billion over the next twenty years, supporting Grayslake area schools and other taxing districts. No increased costs. No water depletion. No traffic jams. Just investment in Grayslake.
1 October 2026 · Investing in Grayslake · $1.5–2K · 350K+ impressions · Promotional · Ad Library
“Will the new data center drain Grayslake’s water?” No. An average-sized building on the campus will use about as much water daily as 8 to 10 average homes (excluding watering of lawns and gardens): roughly 2,500 to 3,500 gallons per day. Campus-wide, that’s less than 0.25% of the daily water flow of the Central Lake County Joint Action Water Agency, which supplies Grayslake’s drinking water.
1 October 2026 · Investing in Grayslake · $1.5–2K · 350K+ impressions · Informational · Ad Library
Grayslake’s new data center will create opportunities for new community improvements. Revenue from the Cornerstone Development will support the preservation of open spaces and other public amenities.
1 October 2026 · Investing in Grayslake · $1.5–2K · 400K+ impressions · Promotional · Ad Library
"Do data centers pay the same electric rates as homeowners?" No. Under Illinois regulation, high-volume users like data centers are billed in their own separate rate class, and according to ComEd, the infrastructure costs of large projects like these are contained to that class of big customers, not residential bills. The Cornerstone Development also funds its own substation and dedicated lines.
16 September 2026 · Investing in Grayslake · $1–1.5K · 200K+ impressions · Informational · Ad Library
Will the data center raise my electric bill?” No. T5 pays all of its own electric costs: its own substation, its own dedicated lines, and its own separate rate class under Illinois law. Data centers are billed separately from homes, so T5’s electricity use will not impact resident rates.
1 October 2026 · Investing in Grayslake · $700 – $799 · 150K+ impressions · Promotional · Ad Library
Figures cover domestic political ads paid in dollars, from 4 May 2026. Spend is the sum of Meta’s range midpoints; impressions above one million are reported as “1M+”, so impression figures are floors. Each ad counts in the week its delivery started, with its lifetime spend at our last pull; ads still running before the vote are counted as of 31 October 2026.
Back to the United States report, both parties and every candidate or every advertiser.