United States 2026 · Every advertiser
Covington, Kentucky Government
This page ran 4 paid political ads on Facebook and Instagram between 15 May 2026 and 1 October 2026. Meta reports $300 – $696 of spend, which makes it the 16,621st largest advertiser of the 24,034 pages in our data. Advertiser type: Public body. Most of its spend took no side. Race: No specific race. Paid for by City of Covington, Kentucky.
Data from the Meta Ad Library, pulled 4 November 2026. Election on 3 November 2026. · Every ad of this page in Meta’s Ad Library ↗
4
ads
$498
reported spend, range $300 – $696
0.0%
of spend on federal races
$100
median spend per ad
Spend by week the ad started
Tone
Share of the 4 ads with text that our model classified. Attack ads name an opponent.
Topics
Spend by race: No specific race 100%.
Spend by ad language: English 100%.
The costliest ads
The highest-spend ad of each distinct text, as it ran.
BLINK is coming — and Covington is ready to light up. ✨ Join us October 8–11 and make The Cov part of your BLINK experience. Grab dinner, meet up for a drink, explore our shops, and experience four nights of incredible art, light and creativity. Plan your BLINK visit to Covington and get all the details on parking, getting around and more.
1 October 2026 · Covington, Kentucky Government · $200 – $299 · 100K+ impressions · Promotional · Ad Library
🚧 TRAFFIC CHANGES ARE COMING TO I-71/75 IN COVINGTON 🚧 As KYTC/ODOT begins construction on the Brent Spence Companion Bridge project, several long-term ramp closures and detours will begin in early June. ⚠️ IMPORTANT: You will ALWAYS be able to get to Covington via I-71/75 throughout construction. 📲 Stay informed and sign up for project updates at brentspencebridgecorridor.com
21 May 2026 · Covington, Kentucky Government · $100 – $199 · 25K+ impressions · Informational · Ad Library
🚧 TRAFFIC CHANGES ARE COMING TO I-71/75 IN COVINGTON 🚧 As KYTC/ODOT begins construction on the Brent Spence Companion Bridge project, several long-term ramp closures and detours will begin in mid-late May. ⚠️ IMPORTANT: You will ALWAYS be able to get to Covington via I-71/75 throughout construction. 📲 Stay informed and sign up for project updates at brentspencebridgecorridor.com
15 May 2026 · Covington, Kentucky Government · $0 – $99 · 15K+ impressions · Informational · Ad Library
Figures cover domestic political ads paid in dollars, from 4 May 2026. Spend is the sum of Meta’s range midpoints; impressions above one million are reported as “1M+”, so impression figures are floors. Each ad counts in the week its delivery started, with its lifetime spend at our last pull; ads still running before the vote are counted as of 31 October 2026.
Back to the United States report, both parties and every candidate or every advertiser.