United States 2026 · Every advertiser
Conservatives of Windsor & Severance Colorado
This page ran 18 paid political ads on Facebook and Instagram between 22 October 2026 and 23 October 2026. Meta reports $0 – $1.8K of spend, which makes it the 14,251st largest advertiser of the 24,034 pages in our data. Advertiser type: Group or campaign. Most of its spend took no side. Race: Ballot measures.
Data from the Meta Ad Library, pulled 4 November 2026. Election on 3 November 2026. · Every ad of this page in Meta’s Ad Library ↗
18
ads
$891
reported spend, range $0 – $1.8K
0.0%
of spend on federal races
$50
median spend per ad
Spend by week the ad started
Tone
Share of the 18 ads with text that our model classified. Attack ads name an opponent.
Topics
Spend by race: Ballot measures 100%.
Spend by ad language: English 100%.
The costliest ads
The highest-spend ad of each distinct text, as it ran.
Vote No and Ask Others to Do the Same Ballot Issue 7F is a permanent property tax increase with no sunset, a full TABOR waiver, and broad authorized uses. It is being sought after a prior permanent increase was sold on a projected Station 5 timeline that has slipped by more than a decade, while the district holds about $25.4 million in cash and advances a multi-million-dollar training facility as a priority. They have already shown they will not spend the money the way they said they would. Res
23 October 2026 · Conservatives of Windsor & Severance Colorado · $0 – $99 · 100+ impressions · Attack · Ad Library
Existing Resources Cover Near-Term Needs The combination of prior permanent mill-levy revenue, current cash reserves of roughly $25.4 million, positive annual net income, competitive pay already in place, and an active training-facility project means the district has capacity to address staffing, equipment, and capital priorities without a new permanent tax increase. Legislative changes and growth pressures exist across Colorado. They do not erase the specific financial position of this distric
23 October 2026 · Conservatives of Windsor & Severance Colorado · $0 – $99 · 100+ impressions · Attack · Ad Library
The Same Pattern Is Repeating In 2019 the district used the projected need for Station 5 to help pass a permanent mill levy. The station was never built on the timeline presented, and the ballot language did not require that it be built. The district kept the money. It now holds about $25.4 million in cash, runs competitive salaries, generates positive net income, and is advancing a separate training facility while asking for another permanent increase that again includes a projected station. T
23 October 2026 · Conservatives of Windsor & Severance Colorado · $0 – $99 · 100+ impressions · Attack · Ad Library
The Money Is for a Training Facility Separately from the ballot measure, the district has purchased land and issued RFPs for a dedicated training facility estimated at $6.5 to 7.5 million. The board has listed beginning design and construction of this facility as a priority. This concurrent capital project is advancing while the district seeks a permanent tax increase of up to $44.3 million per year by 2034. The 7F language is broad enough to cover personnel, apparatus, services, and a fifth st
23 October 2026 · Conservatives of Windsor & Severance Colorado · $0 – $99 · 100+ impressions · Attack · Ad Library
Staffing Plans and Competitive Pay Do Not Require Another Permanent Levy The district currently runs a minimum of three firefighters on first-due engines. NFPA 1710 recommends four. Its own 10-year assessment calls for adding 27 operational firefighters and 6 administrative positions to reach four-person staffing and support future expansion. Lateral firefighter/EMT pay ranges from $84,565 to $105,706 plus a $5,000 hiring bonus, placing the district at the high end of Northern Colorado scales.
23 October 2026 · Conservatives of Windsor & Severance Colorado · $0 – $99 · 100+ impressions · Attack · Ad Library
The 2019 Language Never Required Station 5 to Be Built Nothing in the 2019 mill-levy measure forced the district to construct Station 5 on any particular schedule or with any particular portion of the revenue. The station was listed as an allowed use, not a mandated project with restricted funds. The district built Station 4, retained the permanent revenue, and has now projected Station 5 for 2035. There is no legal barrier preventing the district from seeking a future, more limited measure spe
23 October 2026 · Conservatives of Windsor & Severance Colorado · $0 – $99 · 100+ impressions · Attack · Ad Library
Figures cover domestic political ads paid in dollars, from 4 May 2026. Spend is the sum of Meta’s range midpoints; impressions above one million are reported as “1M+”, so impression figures are floors. Each ad counts in the week its delivery started, with its lifetime spend at our last pull; ads still running before the vote are counted as of 31 October 2026.
Back to the United States report, both parties and every candidate or every advertiser.