United States 2026 · Every advertiser
Black Ridge Renewable Project
This page ran 6 paid political ads on Facebook and Instagram between 23 July 2026 and 28 September 2026. Meta reports $3.3–4.3K of spend, which makes it the 7,550th largest advertiser of the 24,034 pages in our data. Advertiser type: Unidentified. Most of its spend took no side. Race: No specific race.
Data from the Meta Ad Library, pulled 4 November 2026. Election on 3 November 2026. · Every ad of this page in Meta’s Ad Library ↗
6
ads
$3.8K
reported spend, range $3.3–4.3K
0.0%
of spend on federal races
$250
median spend per ad
Spend by week the ad started
Tone
Share of the 6 ads with text that our model classified. Attack ads name an opponent.
Topics
Spend by race: No specific race 100%.
Spend by ad language: English 100%.
The costliest ads
The highest-spend ad of each distinct text, as it ran.
We hear real questions from folks in Apache County about this project, and we want to keep answering them here, in one place. We'll keep adding to this post as new questions come in, so there's always one spot where you can find the answers you're looking for. Q: How tall are the turbines and what model will you use? A: Black Ridge plans to use either of two turbines. One is GE 3.8-154. One is the Vestas V163-4.5. Neither will have a tip height higher than 610 feet. ☑️ You can view the speci
14 August 2026 · Black Ridge Renewable Project · $2–2.5K · 100K+ impressions · Promotional · Ad Library
According to the U.S. Department of Energy, wind turbines maintain an excellent safety record. Extensive research has consistently shown no direct link between wind turbines and human health issues. Additionally, the DOE confirms that sound from properly sited turbines stays well below levels that would impact hearing, making them a quiet, safe addition to the local landscape. Black Ridge is being planned in Apache County with those same siting considerations in mind. Learn more at the link
23 July 2026 · Black Ridge Renewable Project · $900 – $999 · 200K+ impressions · Promotional · Ad Library
Partnering with landowners is at the heart of what we do. The Triple Oak Power team has decades of experience working with ranchers, farmers, and communities to develop renewable energy projects, including here in Arizona. For the Black Ridge project, at least 50% of the generation will be located on private land. Hear from nearby local rancher Bill Elkins as he shares his firsthand experience hosting renewable energy at Rocking Chair Ranch in Navajo County. As Bill puts it: “It pours revenu
28 September 2026 · Black Ridge Renewable Project · $300 – $399 · 15K+ impressions · Promotional · Ad Library
Black Ridge will contribute approximately $65 million in property tax revenue in Apache County. Follow our page to learn more about how the Black Ridge Renewable Project can support schools and long-term community needs.
28 July 2026 · Black Ridge Renewable Project · $0 – $99 · 6K+ impressions · Promotional · Ad Library
Figures cover domestic political ads paid in dollars, from 4 May 2026. Spend is the sum of Meta’s range midpoints; impressions above one million are reported as “1M+”, so impression figures are floors. Each ad counts in the week its delivery started, with its lifetime spend at our last pull; ads still running before the vote are counted as of 31 October 2026.
Back to the United States report, both parties and every candidate or every advertiser.