United States 2026 · Every advertiser

55 Freeway Project

This page ran 5 paid political ads on Facebook and Instagram between 5 May 2026 and 21 October 2026. Meta reports $500 – $995 of spend, which makes it the 14,975th largest advertiser of the 24,034 pages in our data. Advertiser type: Unidentified. Most of its spend took no side. Race: No specific race.

Data from the Meta Ad Library, pulled 4 November 2026. Election on 3 November 2026. · Every ad of this page in Meta’s Ad Library ↗

5

ads

$748

reported spend, range $500 – $995

0.0%

of spend on federal races

$150

median spend per ad

Spend by week the ad started

4 May
1 Jun
6 Jul
3 Aug
7 Sep
5 Oct
 Spend still counting
2 Nov

Tone

Informational
100%

Share of the 5 ads with text that our model classified. Attack ads name an opponent.

Topics

Infrastructure & energy
100%

Spend by race: No specific race 100%.

Spend by ad language: English and Spanish 80%, English 20%.

The costliest ads

The highest-spend ad of each distinct text, as it ran.

  • Crews will be performing concrete paving work to reconstruct the southbound SR-55 McFadden Avenue on-ramp. This will require an extended closure of the ramp beginning at 9 p.m., Wednesday, May 6 to 5 a.m., Friday, June 5. Visit www.octa.net/55Construction to view real-time updates regarding construction activities and closures. 🔶🔶🔶 Los equipos llevarán a cabo trabajos de pavimentación de concreto para reconstruir la rampa de entrada de la SR-55 en dirección sur, a la altura de McFadden Ave

    5 May 2026 · 55 Freeway Project · $200 – $299 · 15K+ impressions · Informational · Ad LibrarySpanish

  • WHAT: Crews are preparing to demolish and reconstruct the center median of SR-55 between I-405 and I-5 to accommodate a new carpool lane. As part of this work, crews will shift northbound SR-55 traffic onto newly constructed lanes. Intermittent nighttime lane and ramp closures will be required. 🔸 PERMANENT ON-RAMP CHANGE 🔸 The northbound McFadden Avenue on-ramp will be permanently restriped as part of the traffic shift. Once the new striping is in place, motorists using this on-ramp will onl

    21 October 2026 · 55 Freeway Project · $100 – $199 · 15K+ impressions · Informational · Ad Library

  • Crews are expected to reconstruct the southbound SR-55 McFadden Avenue off-ramp, which will require an extended closure of the ramp. The off-ramp is expected to close as soon as 9 p.m., Tuesday, May 26 and reopen to motorists by 9 p.m., Friday, June 5. This work may be loud. The schedule is subject to change due to inclement weather or unforeseen operational issues. 🔶🔶🔶 Se espera que las cuadrillas reconstruyan la rampa de salida de la SR-55 de McFadden Avenue en dirección sur, lo que req

    21 May 2026 · 55 Freeway Project · $100 – $199 · 15K+ impressions · Informational · Ad LibrarySpanish

  • Crews are expected to reconstruct the southbound SR-55 Dyer Road straight off-ramp, which will require an extended closure of the ramp. The off-ramp is expected to close as soon as 9 p.m., Tuesday, May 12 and reopen to motorists by 9 p.m., Friday, May 22. This work may be loud. The schedule is subject to change due to inclement weather or unforeseen operational issues. 🔶🔶🔶 Se espera que las cuadrillas reconstruyan la rampa de salida recta de la SR-55 Dyer Road en dirección sur, lo que req

    7 May 2026 · 55 Freeway Project · $100 – $199 · 15K+ impressions · Informational · Ad LibrarySpanish

  • ⚠️ Crews are expected to reconstruct the northbound SR-55 McFadden Avenue off-ramp, which will require an extended closure of the ramp. The off-ramp is expected to close as soon as 9 p.m., Tuesday, July 28 and reopen to motorists by 9 p.m., Friday, Aug. 7. This work may be loud. The schedule is subject to change due to inclement weather or unforeseen operational issues. 🔸🔸🔸 ⚠️ Se prevé que los equipos reconstruyan la rampa de salida a la SR-55 de McFadden Avenue en dirección norte, lo qu

    22 July 2026 · 55 Freeway Project · $0 – $99 · 4K+ impressions · Informational · Ad LibrarySpanish

Figures cover domestic political ads paid in dollars, from 4 May 2026. Spend is the sum of Meta’s range midpoints; impressions above one million are reported as “1M+”, so impression figures are floors. Each ad counts in the week its delivery started, with its lifetime spend at our last pull; ads still running before the vote are counted as of 31 October 2026.

Back to the United States report, both parties and every candidate or every advertiser.

55 Freeway Project: political ads on Facebook and Instagram before the 2026 US midterms · Vipima